head_banner

120kW Split Type DC Charger Station with Dual CCS2 Dispensers

120kW Split Type DC Charger Station with Dual CCS2 Dispensers

MIDA Power is redefining EV infrastructure with the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers, a state-of-the-art 120kW charging solution.

I. Advanced Hardware Topology: SiC MOSFETs and LLC Resonant Converters

The MIDA 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is engineered on a foundation of high-frequency power electronics. We have integrated Silicon Carbide (SiC) MOSFETs to replace traditional Silicon IGBTs, enabling a 30% reduction in switching losses. In the 120kW output configuration, this results in a peak efficiency of 96.5%. The LLC Resonant Converter architecture facilitates Zero Voltage Switching (ZVS), ensuring thermal stability even during prolonged high-current sessions at 120kW. This is critical for 1000V high-voltage platforms, allowing the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers to charge next-generation EVs with extreme precision.

120kW Split Type DC Charger Station with Dual CCS2 Dispensers

Thermal management is managed via MIDA’s proprietary isolated air-duct system. The power modules reside in a dedicated cooling channel, hermetically separated from the logic boards. This prevents dust accumulation and ensures an IP55 rating for outdoor longevity.

II. AI-DES v4.0: The Intelligence Layer

The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers features the AI-DES (AI-Dynamic Energy Scheduling) v4.0 gateway. This system operates across three tiers: Grid-Edge Responsiveness (10kHz sampling), Vehicle-Specific Profiling (ISO 15118), and Economic Load Balancing. For sites with multiple 120kW units, the AI-DES system performs real-time peak shaving, ensuring site-wide load never exceeds contract limits while prioritizing vehicles with low State-of-Charge (SoC).

III. Commercial ROI Analysis and TCO Metrics

For a CPO, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers represents a high-yield asset. With 96.5% efficiency, a 120kW station with 300,000 kWh annual throughput saves approximately 15,000 kWh in energy waste compared to industry standard units. This translates to $2,250 in annual OPEX savings (@$0.15/kWh).

Metric Industry Standard (91%) MIDA 120kW (96.5%)
Heat Energy Waste 27,000 kWh 10,500 kWh
Efficiency Gain Baseline 5.5% Improvement
Operational Life (MTBF) 50,000 Hours 92,000 Hours

IV. Installation SOP and Global Compliance

Installing the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers follows a strict MIDA SOP. Requirements include a C30-grade reinforced concrete base, SPD Class II surge protection, and ground resistance below 4 Ohms. The station is fully certified under CE (IEC 61851), UL 2202, and CHAdeMO 2.0.1 for global interoperability.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Moreover, MIDA Power’s 2026 strategic roadmap emphasizes the transition to V2G (Vehicle-to-Grid) and MCS (Megawatt Charging Systems). The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is future-proof, allowing for bidirectional energy flow to support grid stability. By buffering energy in the fleet’s battery packs, the 120kW Split Type DC Charger Station with Dual CCS2 Dispensers acts as a Virtual Power Plant node, enabling revenue generation through frequency regulation markets.

Conclusion

The 120kW Split Type DC Charger Station with Dual CCS2 Dispensers is the definitive choice for professional EV infrastructure.


Post time: Aug-08-2026

Leave Your Message:

Write your message here and send it to us