Fleet Charging BESS Battery Storage EV Infrastructure US Utility 240kW 260kWh Factory Supply
Fleet Charging BESS Battery Storage EV Infrastructure US Utility 240kW 260kWh Factory Supply
The Fleet Charging BESS Battery Storage EV Infrastructure US Utility 240kW 260kWh Factory Supply is a CE and UL certified integrated battery energy storage and DC fast charging system that combines 260kWh of LFP storage with 240kW DC output. It buffers grid and solar energy to deliver high-power EV charging for fleet and bus depots, cutting demand charges, supporting peak shaving and ensuring reliable rapid charging even on grid-constrained sites.
Core Advantages
- Integrated BESS + DC Charger – 260kWh LFP storage and 240kW DC output in one cabinet.
- Peak Shaving & Demand Charge Cut – stores cheap energy, caps costly grid spikes.
- Solar-Ready Hybrid Operation – on-grid, off-grid and solar-plus-storage modes.
- LFP Safety & Long Life – automotive-grade cells, multi-level BMS, fire protection.
- OCPP Smart Management – OCPP 1.6J/2.0.1, remote control, dynamic load balancing.
- Outdoor-Rated & Certified – IP54/IP55, wide temperature range, CE/UL/IEC.
Product Highlights

LFP Battery Safety and Long Cycle Life
At the core of the Fleet Charging BESS Battery Storage EV Infrastructure US Utility 240kW 260kWh Factory Supply is an automotive-grade lithium iron phosphate battery chosen for thermal stability, long cycle life and safe operation. A multi-level battery management system supervises cell voltage, current and temperature, balancing cells and isolating faults before they escalate. The design targets thousands of full cycles with slow capacity fade, supporting a long service life under daily cycling. Integrated fire detection, aerosol suppression and compartment isolation meet strict safety standards, giving operators of fleet and bus depots confidence that the storage system will perform reliably and safely across many years of demanding commercial duty.
After-Sales Support and OEM ODM Service
MIDA backs the Fleet Charging BESS Battery Storage EV Infrastructure US Utility 240kW 260kWh Factory Supply with comprehensive after-sales support, including a multi-year warranty, global spare-parts availability and remote plus on-site technical service. Engineering teams assist with system sizing, grid-connection studies, installation guidance and commissioning to shorten project timelines. Full OEM and ODM capability lets distributors and developers customize enclosure styling, branding, connector configuration, battery capacity and software features to match their market. From first enquiry through years of operation, this partnership approach gives buyers of fleet and bus depots a bankable supplier, predictable total cost of ownership and a storage-and-charging solution tailored precisely to their commercial requirements and growth plans.


Solar Integration and Off-Grid Resilience
The Fleet Charging BESS Battery Storage EV Infrastructure US Utility 240kW 260kWh Factory Supply is solar-ready, accepting photovoltaic input so sites charge electric vehicles directly from clean on-site generation. Surplus daytime solar is stored in the BESS and released to charge vehicles after sunset or during peak tariff windows, maximizing self-consumption and renewable usage. In grid-weak or off-grid locations the battery and solar combination guarantees continuous fast charging where mains power is limited or absent. For fleet and bus depots, this hybrid operation reduces carbon footprint, cuts reliance on diesel generators and delivers energy independence while maintaining dependable DC charging output around the clock, every day.
Integrated BESS and DC Charging Architecture
The Fleet Charging BESS Battery Storage EV Infrastructure US Utility 240kW 260kWh Factory Supply merges a high-density LFP battery pack with a bidirectional power conversion system and a DC fast charging stage inside one weatherproof enclosure. By buffering grid energy in the battery, the station delivers burst charging power far above the site grid connection, so operators add fast charging to constrained locations without costly transformer upgrades. The integrated BESS smooths load, shaves peaks and stores cheap off-peak or solar energy for use during demand spikes. This architecture turns any fleet and bus depots into a resilient, grid-friendly charging hub that keeps vehicles moving while protecting the local distribution network from overload.


Smart Management, OCPP and Remote Control
Every Fleet Charging BESS Battery Storage EV Infrastructure US Utility 240kW 260kWh Factory Supply runs OCPP 1.6J with an upgrade path to OCPP 2.0.1, so it integrates with leading charging network platforms for authorization, billing and monitoring. Operators manage charging schedules, battery dispatch, user access and energy flows through a cloud dashboard, with real-time alerts and remote diagnostics that cut site visits. Dynamic load management shares available power between multiple connectors and the battery, while RFID, app and card payment support flexible business models. This connected intelligence lets owners of fleet and bus depots operate many sites efficiently, maximize uptime and adapt tariffs as energy markets evolve.
Modular Scalability and Flexible Deployment
The Fleet Charging BESS Battery Storage EV Infrastructure US Utility 240kW 260kWh Factory Supply uses a modular design so battery capacity and charging power scale to match site demand and budget. Containerized and cabinet formats support quick installation, and additional modules expand energy or power as traffic grows, protecting the initial investment. Standardized interfaces simplify commissioning, maintenance and future upgrades, while the compact footprint suits sites where space is tight. Whether deployed as a single unit or a networked fleet of stations, this scalable platform lets operators of fleet and bus depots roll out charging infrastructure in phases, add capacity on demand and standardize hardware across an entire portfolio with ease.

Product Specifications
| Battery Capacity | 260kWh (configurable) | DC Output Power | 240kW (configurable) |
| Battery Type | LFP (LiFePO4) | Output Voltage | 150-1000V DC |
| Connectors | CCS2 standard; CCS1/GB-T/CHAdeMO/NACS optional | Protocol | OCPP 1.6J / 2.0.1 |
| Grid Input | 3-phase 380/400V AC; solar PV ready | Operation Modes | On-grid / Off-grid / Hybrid |
| Protection | IP54/IP55, IK10 | Temperature | -30°C to +55°C |
| Safety | BMS, fire suppression, insulation monitoring | Certification | CE, UL, IEC, RoHS |
Application Scenarios
The Fleet Charging BESS Battery Storage EV Infrastructure US Utility 240kW 260kWh Factory Supply is deployed across fleet and bus depots, highway corridors, logistics and bus depots, commercial car parks, and renewable microgrids. Explore related MIDA storage and charging solutions: 522KWH 240KW Factory Direct Solar Storage EV Charging Station 522KWH 240KW Grid Connected Solar Storage EV Station Commercial 522KWH 240KW BESS EV Charging Station Solar Integration Commercial 522KWH 240KW PV BESS EV Charging Station For Commercial 522KWH 240KW Intelligent Solar Storage EV Charging System Remote.
Frequently Asked Questions (FAQ)
How much grid power does the 160kWh 90kW system need?
Because the 160kWh battery supplies the charging peaks, the 160kWh 90kW unit draws a much smaller, steadier load from the grid than a 90kW charger alone. It stores energy during off-peak hours or from solar and discharges it during charging sessions, so sites can add fast charging without expensive transformer or grid upgrades.
What is the configuration of the 60kWh 30kW BESS EV charging system?
The 60kWh 30kW configuration pairs a 60kWh LFP battery with a 30kW DC charging output in one integrated cabinet. The battery buffers grid and solar energy so the station delivers 30kW fast charging even where the grid connection is limited, making it ideal for peak shaving, demand charge reduction and reliable rapid EV charging at commercial and fleet sites.
How much grid power does the 960kWh 400kW system need?
Because the 960kWh battery supplies the charging peaks, the 960kWh 400kW unit draws a much smaller, steadier load from the grid than a 400kW charger alone. It stores energy during off-peak hours or from solar and discharges it during charging sessions, so sites can add fast charging without expensive transformer or grid upgrades.
How much grid power does the 482kWh 320kW system need?
Because the 482kWh battery supplies the charging peaks, the 482kWh 320kW unit draws a much smaller, steadier load from the grid than a 320kW charger alone. It stores energy during off-peak hours or from solar and discharges it during charging sessions, so sites can add fast charging without expensive transformer or grid upgrades.
How many vehicles can the 50kW 93kWh station charge per day?
Daily throughput of the 50kW 93kWh system depends on vehicle battery size and arrival pattern, but the 93kWh storage plus continuous grid and solar recharge lets the station support repeated 50kW charging sessions across the day. The energy management system schedules battery dispatch to maximize sessions while protecting cell life.
What is the configuration of the 372kWh 240kW BESS EV charging system?
The 372kWh 240kW configuration pairs a 372kWh LFP battery with a 240kW DC charging output in one integrated cabinet. The battery buffers grid and solar energy so the station delivers 240kW fast charging even where the grid connection is limited, making it ideal for peak shaving, demand charge reduction and reliable rapid EV charging at commercial and fleet sites.
How many vehicles can the 418kWh 180kW station charge per day?
Daily throughput of the 418kWh 180kW system depends on vehicle battery size and arrival pattern, but the 418kWh storage plus continuous grid and solar recharge lets the station support repeated 180kW charging sessions across the day. The energy management system schedules battery dispatch to maximize sessions while protecting cell life.
How many vehicles can the 240kW 260kWh station charge per day?
Daily throughput of the 240kW 260kWh system depends on vehicle battery size and arrival pattern, but the 260kWh storage plus continuous grid and solar recharge lets the station support repeated 240kW charging sessions across the day. The energy management system schedules battery dispatch to maximize sessions while protecting cell life.
After-Sales Advantages
MIDA supports the Fleet Charging BESS Battery Storage EV Infrastructure US Utility 240kW 260kWh Factory Supply with a multi-year warranty, global spare parts, remote diagnostics and on-site service, plus full OEM/ODM customization of capacity, connectors, enclosure and software. Engineering support covers sizing, grid-connection studies and commissioning for fast, bankable project delivery.
Portable EV Charger
Home EV Wallbox
DC Charger Station
BESS Charging Station
V2G V2H V2V V2L
EV Charging Module
DC Charging Connector
EV Accessories