head_banner

V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply


Product Detail

Product Tags

V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply

The V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply is a CE and UL certified integrated battery energy storage and DC fast charging system that combines 960kWh of LFP storage with 420kW DC output. It buffers grid and solar energy to deliver high-power EV charging for V2G bidirectional and grid-balancing sites, cutting demand charges, supporting peak shaving and ensuring reliable rapid charging even on grid-constrained sites.

Core Advantages

  • Integrated BESS + DC Charger – 960kWh LFP storage and 420kW DC output in one cabinet.
  • Peak Shaving & Demand Charge Cut – stores cheap energy, caps costly grid spikes.
  • Solar-Ready Hybrid Operation – on-grid, off-grid and solar-plus-storage modes.
  • LFP Safety & Long Life – automotive-grade cells, multi-level BMS, fire protection.
  • OCPP Smart Management – OCPP 1.6J/2.0.1, remote control, dynamic load balancing.
  • Outdoor-Rated & Certified – IP54/IP55, wide temperature range, CE/UL/IEC.

Product Highlights

V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply - Smart Management, OCPP and Remote Control

Smart Management, OCPP and Remote Control

Every V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply runs OCPP 1.6J with an upgrade path to OCPP 2.0.1, so it integrates with leading charging network platforms for authorization, billing and monitoring. Operators manage charging schedules, battery dispatch, user access and energy flows through a cloud dashboard, with real-time alerts and remote diagnostics that cut site visits. Dynamic load management shares available power between multiple connectors and the battery, while RFID, app and card payment support flexible business models. This connected intelligence lets owners of V2G bidirectional and grid-balancing sites operate many sites efficiently, maximize uptime and adapt tariffs as energy markets evolve.

Outdoor-Rated Durability and Global Certification

Built for harsh outdoor duty, the V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply carries an IP54/IP55 enclosure and a wide operating temperature window from sub-zero cold to desert heat, with corrosion-resistant construction for coastal and industrial sites. The station is engineered to international standards including CE, UL, IEC and relevant grid-connection and fire-safety codes, so it qualifies for projects and incentive programs worldwide. Robust thermal management keeps the battery and power electronics within safe limits under continuous cycling. For V2G bidirectional and grid-balancing sites, this rugged, certified design means dependable year-round operation, straightforward permitting and long-term asset value in almost any climate on earth.

V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply - Outdoor-Rated Durability and Global Certification
V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply - LFP Battery Safety and Long Cycle Life

LFP Battery Safety and Long Cycle Life

At the core of the V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply is an automotive-grade lithium iron phosphate battery chosen for thermal stability, long cycle life and safe operation. A multi-level battery management system supervises cell voltage, current and temperature, balancing cells and isolating faults before they escalate. The design targets thousands of full cycles with slow capacity fade, supporting a long service life under daily cycling. Integrated fire detection, aerosol suppression and compartment isolation meet strict safety standards, giving operators of V2G bidirectional and grid-balancing sites confidence that the storage system will perform reliably and safely across many years of demanding commercial duty.

Solar Integration and Off-Grid Resilience

The V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply is solar-ready, accepting photovoltaic input so sites charge electric vehicles directly from clean on-site generation. Surplus daytime solar is stored in the BESS and released to charge vehicles after sunset or during peak tariff windows, maximizing self-consumption and renewable usage. In grid-weak or off-grid locations the battery and solar combination guarantees continuous fast charging where mains power is limited or absent. For V2G bidirectional and grid-balancing sites, this hybrid operation reduces carbon footprint, cuts reliance on diesel generators and delivers energy independence while maintaining dependable DC charging output around the clock, every day.

V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply - Solar Integration and Off-Grid Resilience
V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply - Modular Scalability and Flexible Deployment

Modular Scalability and Flexible Deployment

The V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply uses a modular design so battery capacity and charging power scale to match site demand and budget. Containerized and cabinet formats support quick installation, and additional modules expand energy or power as traffic grows, protecting the initial investment. Standardized interfaces simplify commissioning, maintenance and future upgrades, while the compact footprint suits sites where space is tight. Whether deployed as a single unit or a networked fleet of stations, this scalable platform lets operators of V2G bidirectional and grid-balancing sites roll out charging infrastructure in phases, add capacity on demand and standardize hardware across an entire portfolio with ease.

Peak Shaving and Demand Charge Reduction

Commercial electricity tariffs punish short power spikes with high demand charges, and EV fast charging creates exactly those spikes. The V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply stores energy when power is cheap and discharges it during charging sessions, flattening the site load profile and slashing demand charges. The intelligent energy management system continuously monitors grid import, battery state of charge and charging demand, dispatching stored power to cap peak draw. For V2G bidirectional and grid-balancing sites, this converts an unpredictable, expensive load into a controlled one, improving charging economics, protecting the grid connection and shortening the payback period of the entire storage and charging investment significantly.

V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply - Peak Shaving and Demand Charge Reduction

Product Specifications

Battery Capacity 960kWh (configurable) DC Output Power 420kW (configurable)
Battery Type LFP (LiFePO4) Output Voltage 150-1000V DC
Connectors CCS2 standard; CCS1/GB-T/CHAdeMO/NACS optional Protocol OCPP 1.6J / 2.0.1
Grid Input 3-phase 380/400V AC; solar PV ready Operation Modes On-grid / Off-grid / Hybrid
Protection IP54/IP55, IK10 Temperature -30°C to +55°C
Safety BMS, fire suppression, insulation monitoring Certification CE, UL, IEC, RoHS

Application Scenarios

The V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply is deployed across V2G bidirectional and grid-balancing sites, highway corridors, logistics and bus depots, commercial car parks, and renewable microgrids. Explore related MIDA storage and charging solutions: 418KWH 180KW Intelligent Solar Storage EV Charging System Remote 522KWH 240KW Integrated Solar Storage EV Charging Station For Versatile Solar BESS Energy Storage System 200KWH 522KWH For 522KWH 240KW Solar Storage Charging System With DC Charger 261KWH 120KW PV BESS EV Charging Station For Commercial.

Frequently Asked Questions (FAQ)

How much grid power does the 1000kWh 480kW system need?

Because the 1000kWh battery supplies the charging peaks, the 1000kWh 480kW unit draws a much smaller, steadier load from the grid than a 480kW charger alone. It stores energy during off-peak hours or from solar and discharges it during charging sessions, so sites can add fast charging without expensive transformer or grid upgrades.

How many vehicles can the 1MWh 480kW station charge per day?

Daily throughput of the 1MWh 480kW system depends on vehicle battery size and arrival pattern, but the 1MWh storage plus continuous grid and solar recharge lets the station support repeated 480kW charging sessions across the day. The energy management system schedules battery dispatch to maximize sessions while protecting cell life.

How much grid power does the 216kWh 120kW system need?

Because the 216kWh battery supplies the charging peaks, the 216kWh 120kW unit draws a much smaller, steadier load from the grid than a 120kW charger alone. It stores energy during off-peak hours or from solar and discharges it during charging sessions, so sites can add fast charging without expensive transformer or grid upgrades.

What is the configuration of the 372kWh 240kW BESS EV charging system?

The 372kWh 240kW configuration pairs a 372kWh LFP battery with a 240kW DC charging output in one integrated cabinet. The battery buffers grid and solar energy so the station delivers 240kW fast charging even where the grid connection is limited, making it ideal for peak shaving, demand charge reduction and reliable rapid EV charging at commercial and fleet sites.

How many vehicles can the 120kWh 60kW station charge per day?

Daily throughput of the 120kWh 60kW system depends on vehicle battery size and arrival pattern, but the 120kWh storage plus continuous grid and solar recharge lets the station support repeated 60kW charging sessions across the day. The energy management system schedules battery dispatch to maximize sessions while protecting cell life.

How much grid power does the 960kWh 420kW system need?

Because the 960kWh battery supplies the charging peaks, the 960kWh 420kW unit draws a much smaller, steadier load from the grid than a 420kW charger alone. It stores energy during off-peak hours or from solar and discharges it during charging sessions, so sites can add fast charging without expensive transformer or grid upgrades.

How much grid power does the 241kWh 160kW system need?

Because the 241kWh battery supplies the charging peaks, the 241kWh 160kW unit draws a much smaller, steadier load from the grid than a 160kW charger alone. It stores energy during off-peak hours or from solar and discharges it during charging sessions, so sites can add fast charging without expensive transformer or grid upgrades.

After-Sales Advantages

MIDA supports the V2G Bidirectional BESS Battery Storage EV Charging System Smart Grid 960kWh 420kW Factory Supply with a multi-year warranty, global spare parts, remote diagnostics and on-site service, plus full OEM/ODM customization of capacity, connectors, enclosure and software. Engineering support covers sizing, grid-connection studies and commissioning for fast, bankable project delivery.


  • Previous:
  • Next:

  • Leave Your Message:

    Leave Your Message:

    Write your message here and send it to us