head_banner

Outdoor Containerized BESS Energy Storage Station 200kWh 522kWh High Voltage Battery Fast Charging System

MIDA Outdoor Containerized BESS Energy Storage Station 200kWh 522kWh High Voltage is a BESS-integrated DC fast charging station combining high-power charging with battery storage and solar input. Through peak shaving and demand-charge reduction it delivers…


Product Detail

Product Tags

Outdoor Containerized BESS Energy Storage Station 200kWh 522kWh High Voltage Battery Fast Charging System

Product Overview

The MIDA Outdoor Containerized BESS Energy Storage Station delivers 200kWh to 522kWh of high-voltage LiFePO4 storage in a rugged, weatherproof enclosure built for outdoor deployment. This containerized battery energy storage system integrates a high-voltage battery string, bidirectional PCS, liquid cooling, fire suppression, and intelligent EMS to support high-power DC fast charging in any environment.

The high-voltage architecture reduces current and cabling losses, improving system efficiency while enabling up to 240kW DC output for demanding fast charging applications.

Core Advantages

  • Outdoor-Rated Containerized Enclosure – IP55 weatherproof design with integrated thermal management for reliable operation in harsh outdoor conditions.
  • High-Voltage Efficiency – The high-voltage battery architecture lowers conduction losses and boosts round-trip efficiency across the 200kWh-522kWh range.
  • High-Power DC Fast Charging – Up to 240kW CCS2 output supports rapid charging for public and fleet vehicles.
  • Peak Shaving & Backup – Stores off-peak or solar energy for peak shaving and provides backup power during grid outages.
  • Liquid Cooling Longevity – Active liquid cooling extends LiFePO4 cycle life and maintains performance under continuous load.
  • Modular Scalability – Containers can be paralleled to expand storage capacity as demand grows.
  • Smart Monitoring – OCPP 1.6J / 2.0.1 and remote EMS enable real-time control and diagnostics.

Product Specifications

Parameter Specification
Battery Capacity 200kWh / 522kWh
Output Power 240kW DC
Battery Type LiFePO4 (Lithium Iron Phosphate)
Cell Automotive-grade prismatic LiFePO4
System Voltage High Voltage 200V – 1000V DC
Connector CCS2 (CCS1 / NACS optional)
Cooling Liquid cooling thermal management
Protection Rating IP55
Communication OCPP 1.6J / 2.0.1, 4G / Ethernet
Operating Temperature -30°C to +55°C
Cycle Life > 6000 cycles
Certifications CE, UL, UN38.3, IEC62619

Application Scenarios

This outdoor containerized BESS energy storage station is ideal for highway corridors, logistics yards, industrial parks, and remote or off-grid charging sites exposed to the elements. Its high-voltage fast charging system minimizes dwell time for high-traffic locations.

The station also supports microgrid and peak shaving roles, buffering solar or off-peak grid energy to reduce demand charges and enabling charging deployment where grid capacity is insufficient.

After-sales Advantages

MIDA provides a comprehensive warranty, global spare-parts support, and remote EMS diagnostics for continuous monitoring of high-voltage battery strings, PCS, and charging output. Remote updates keep safety and control logic current.

Backed by over a decade of experience in battery energy storage and EV charging, MIDA offers OEM/ODM customization, site commissioning, and worldwide lifecycle support for outdoor containerized deployments.

Related MIDA Charging Solutions

Explore related high-power charging equipment from MIDA: Smart Management BESS Energy Storage System 200kWh 522kWh, Heavy Duty BESS Charging Station 200kWh 522kWh, Versatile Solar BESS Energy Storage System 200kWh 522kWh, Integrated Solar BESS Charging Station 120kWh 522kWh Peak.

Frequently Asked Questions (FAQ)

What is a BESS-integrated DC charging station?

A BESS (Battery Energy Storage System) integrated DC charging station combines a fast charger with on-board lithium battery storage. The battery buffers energy from the grid or solar, so the station can deliver high charging power even where the grid connection is limited.

How does peak shaving lower charging costs?

The BESS charges its internal battery during off-peak, low-tariff periods and discharges it during peak demand. This peak-shaving strategy reduces expensive demand charges and lets the station output more power than the grid connection alone would allow.

Can the storage charging station run on solar and off-grid?

Yes. Solar-BESS and microgrid models integrate photovoltaic input with battery storage for off-grid or grid-constrained operation, ideal for remote depots, fleet hubs and sites awaiting grid upgrades.

What is the storage capacity and how is it configured?

Storage capacity is modular and configured to the site load profile (for example 215kWh and above). MIDA sizes the battery, PCS and charger power together so the system matches daily energy throughput and peak-power targets.

Which management protocols does the BESS charger support?

The BESS DC charger supports OCPP 2.0.1 for charging management plus an energy-management system for storage, solar and grid coordination, demand response and remote monitoring.

What warranty and support come with the BESS system?

MIDA provides a full warranty on the charger and storage system, global spare parts, remote diagnostics and lifecycle technical support, protecting the investment across the full deployment.

Related searches: Outdoor Containerized BESS Energy Storage Station 200kWh 522kWh, DC fast charging station, EV charging equipment, OCPP EVSE manufacturer.









  • Previous:
  • Next:

  • Leave Your Message:

    Leave Your Message:

    Write your message here and send it to us